Load the boreholes and composite.

  • The boreholes should be loaded and the intervals are changed so that they have equal weight in the geostatistical calculation. That's called compositing.
  • To pick the interval length, the distribution of lengths can be analyzed.
  • Paraview can visualize the PyGSLIB output like this: